| 501 of 2012 (PDF, 18 KB) |
Caloundra Bar – navigation warning. |
AUS 235 MB1 Beacon to Beacon edition 9, map 73 |
16 May 2012 |
| 498 T of 2012 (PDF, 1.17 MB) |
Mooloolah River entrance – navigation warning, hydrographic survey results, aids to navigation destroyed or unreliable. |
AUS 235 MB1 Beacon to Beacon edition 9, map 71 |
15 May 2012 |
| 497 T of 2012 (PDF, 18 KB) |
Boulevarde Cove, Raby Bay – revetment wall repairs. |
MB8 Beacon to Beacon edition 9, map 111 |
15 May 2012 |
| 496 T of 2012 (PDF, 17 KB) |
Cabbage Tree Creek – flare demonstration. |
AUS 236 MB1, MB8 Beacon to Beacon edition 9, map 102 |
15 May 2012 |
| 485 T of 2012 (PDF, 880 KB) |
Brisbane River, between the Captain Cook Bridge and Thornton Street ferry terminal – Harbour Masters Direction, vessel traffic restrictions. |
AUS 238 Beacon to Beacon edition 9, map 95 |
14 May 2012 |
| 484 T of 2012 (PDF, 18 KB) |
Bulimba Reach, Brisbane River – wharf demolition works. |
AUS 238 Beacon to Beacon edition 9, map 96 |
14 May 2012 |
| 483 T of 2012 (PDF, 18 KB) |
Manly Boat Harbour – flare demonstration. |
AUS 236, AUS 814 MB1, MB8 Beacon to Beacon edition 9, maps 108 and 110 |
14 May 2012 |
| 481 T of 2012 (PDF, 17 KB) |
Pine River, Moreton Bay – beacon established in position. |
MB1 Beacon to Beacon edition 9, map 88 |
14 May 2012 |
| 478 of 2012 (PDF, 17 KB) |
Manly Boat Harbour - light restored to normal. |
AUS 236 MB1, MB8 Beacon to Beacon edition 9, map 110 |
11 May 2012 |
| 462 T of 2012 (PDF, 18 KB) |
Long Pocket Reach, Brisbane River – earth works, boat ramp. |
Beacon to Beacon edition 9, map 94 |
9 May 2012 |
| 460 T of 2012 (PDF, 18 KB) |
Mooloolah River entrance and coastal bar – sand depth measurement operations. |
AUS 235 MB1 Beacon to Beacon edition 9, map 71 |
9 May 2012 |
| 447 of 2012 (PDF, 18 KB) |
Kawana Waters Main Canal – removal of sunken wreck and associated temporary buoy. |
Beacon to Beacon edition 9, map 71 |
8 May 2012 |
| 443 T of 2012 (PDF, 3.76 MB) |
Tuckers Creek, Mooloolaba – bridge duplication project, closure of waterway and establishment of temporary aids to navigation. |
Beacon to Beacon edition 9, map 70 |
4 May 2012 |
| 433 T of 2012 (PDF, 18 KB) |
Lime Pocket Camping Grounds, Pumicestone Passage – starboard lateral beacon damaged. |
Beacon to Beacon edition 9, map 76 |
2 May 2012 |
| 429 T of 2012 (PDF, 20 KB) |
Fisherman Island swing basin, Brisbane River – exclusion zone. |
AUS 237 MB1 Beacon to Beacon edition 9, maps 99 & 103 |
1 May 2012 |
| 394 T of 2012 (PDF, 18 KB) |
North East Channel, Moreton Bay – navigational marker re-established. |
AUS 236 Beacon to Beacon edition 9, map 83 |
23 April 2012 |
| 387 T of 2012 (PDF, 18 KB) |
STS 1 Anchorage, Moreton Bay – ship to ship LPG transfer. |
AUS 236 MB1 Beacon to Beacon edition 9, map 90 |
19 April 2012 |
| 386 T of 2012 (PDF, 17 KB) |
St Lucia Reach, Brisbane River – bank stabilisation works. |
Beacon to Beacon edition 9, map 106 |
19 April 2012 |
| 385 T of 2012 (PDF, 18 KB) |
Gateway Motorway, Cabbage Tree Creek – bridge construction works. |
Beacon to Beacon edition 9, map 88 |
19 April 2012 |
| 379 T of 2012 (PDF, 18 KB) |
North East Channel – temporary withdrawal of navigation aid. |
AUS 236 Beacon to Beacon edition 9, map 83 |
18 April 2012 |
| 374 T of 2012 (PDF, 18 KB) |
St Helena Island, Moreton Bay – hazard to navigation, temporary buoy established in position. |
AUS 236 MB1 Beacon to Beacon edition 9, map 104 |
18 April 2012 |
| 363 T of 2012 (PDF, 18 KB) |
Maroochy River near Coolum Creek – removal of logs, potential obstructions to navigation and navigation warning. |
Beacon to Beacon edition 9, map 65 |
17 April 2012 |
| 350 T of 2012 (PDF, 18 KB) |
Pumicestone Passage near Golden Beach and Bells Creek – lit beacons and buoys reported as irregular. |
Beacon to Beacon edition 9, map 73 |
13 April 2012 |
| 344 T of 2012 (PDF, 18 KB) |
Bar Cutting, Fisherman Island, Brisbane River – temporary withdrawal of navigation aid. |
AUS 236 MB1 Beacon to Beacon edition 9, map 103 |
12 April 2012 |
| 339 T of 2012 (PDF, 17 KB) |
Pumicestone Passage near Toorbul – starboard lateral beacon damaged. |
AUS 235 MB1 Beacon to Beacon edition 9, map 77 |
11 April 2012 |
| 334 of 2012 (PDF, 19 KB) |
Quarries Reach, Brisbane River – permanent arrangement of leading lights. |
AUS 238 MB1 Beacon to Beacon edition 9, maps 97 and 98 |
11 April 2012 |
| 329 T of 2012 (PDF, 18 KB) |
Spitfire Channel to Woorim, Moreton Bay - dredging and beach replenishment operations. |
AUS 235, AUS 236 MB1 Beacon to Beacon edition 9, map 82 |
5 April 2012 |
| 316 of 2012 (PDF, 18 KB) |
Coochiemudlo Island, Moreton Bay – hazard to navigation removed, sunken yacht. |
AUS 236 MB7 Beacon to Beacon edition 9, map 118 |
3 April 2012 |
| 310 T of 2012 (PDF, 18 KB) |
STS 1 Anchorage, Moreton Bay – ship to ship LPG transfer. |
AUS 236 MB1 Beacon to Beacon edition 9, map 90 |
3 April 2012 |
| 293 T of 2012 (PDF, 628 KB) |
Quarantine Flats Reach, Brisbane River – exclusion zone established. |
AUS 237 MB1 Beacon to Beacon edition 9, map 99 |
28 March 2012 |
| 281 of 2012 (PDF, 18 KB) |
Tangalooma Wrecks, Barge Landing – buoy replaced in position. |
AUS 236 MB1 Beacon to Beacon edition 9, map 91 |
26 March 2012 |
| 243 T of 2012 (PDF, 18 KB) |
White Patch, Pumicestone Passage – starboard lateral beacon unlit. |
AUS 235 MB1 Beacon to Beacon edition 9, map 78 |
14 March 2012 |
| 233 T of 2012 (PDF, 20 KB) |
Quarantine Flats Reach, Brisbane River – hazard removal operations. |
AUS 237 Beacon to Beacon edition 9, map 99 |
12 March 2012 |
| 232 of 2012 (PDF, 18 KB) |
Maroochy River – completion of geotechnical works. |
Beacon to Beacon edition 9, map 66 |
12 March 2012 |
| 230 T of 2012 (PDF, 18 KB) |
Dalys Reach to St Lucia Reach, Brisbane River – debris hazard removal operations. |
Beacon to Beacon edition 9, maps 93 and 94 |
9 March 2012 |
| 221 T of 2012 (PDF, 18 KB) |
Sunshine Coast Waterways – navigation warning, potential obstructions to navigation. |
AUS 235 MB1 Beacon to Beacon edition 9, maps 64 to 67, 68 to 71, 73 to 81 |
9 March 2012 |
| 220 T of 2012 (PDF, 18 KB) |
Quarantine Flats Reach, Brisbane River – bank slippage. |
AUS 237 MB1 Beacon to Beacon edition 9, map 99 |
9 March 2012 |
| 211 T of 2012 (PDF, 18 KB) |
Cabbage Tree Creek – dredging operations. |
AUS 236 MB1, MB8 Beacon to Beacon edition 9, map 100 |
8 March 2012 |
| 210 T of 2012 (PDF, 18 KB) |
Quarantine Flats Reach, Brisbane River – bank slippage. |
AUS 237 Beacon to Beacon edition 9, map 99 |
7 March 2012 |
| 208 T of 2012 (PDF, 18 KB) |
Middle Banks, Moreton Bay – surveying operations. |
AUS 236 MB1 Beacon to Beacon edition 9, map 91 |
7 March 2012 |
| 191 T of 2012 (PDF, 18 KB) |
Bulimba Creek – bridge construction works. |
Beacon to Beacon edition 9, map 97 |
1 March 2012 |
| 188 T of 2012 (PDF, 18 KB) |
Chain Banks – beacon destroyed, temporary buoy established in position. |
MB1, MB8 Beacon to Beacon edition 9, map 113 |
29 February 2012 |
| 177 of 2012 (PDF, 17 KB) |
Hamilton Reach, Brisbane River – buoy altered in position. |
AUS 238 Beacon to Beacon edition 9, map 96 |
24 February 2012 |
| 149 T of 2012 (PDF, 18 KB) |
Cabbage Tree Creek – beacon destroyed, temporary buoy established. |
AUS 235 MB1, MB8 Beacon to Beacon edition 9, maps 100 and 102 |
15 February 2012 |
| 144 T of 2012 (PDF, 18 KB) |
Cabbage Tree Creek, Shorncliffe – shoaling. |
MB1, MB8 Beacon to Beacon edition 9, map 100 |
14 February 2012 |
| 134 T of 2012 (PDF, 18 KB) |
Scarborough Harbour, Deception Bay – beacon destroyed, temporary buoy established in position. |
AUS 236 MB1 Beacon to Beacon edition 9, map 86 |
10 February 2012 |
| 124 T of 2012 (PDF, 289 KB) |
A.J. Wyllie Bridge, North Pine River – temporary prohibition of anchoring, berthing, mooring & operating of all ships. |
None |
9 February 2012 |
| 094 T of 2012 (PDF, 17 KB) |
Schulz Canal, Toombul – flood mitigation works. |
AUS 236 Beacon to Beacon edition 8, map 90 Beacon to Beacon edition 9, map 102 |
3 February 2012 |
| 049 of 2012 (PDF, 18 KB) |
Krummel Passage, Moreton Bay – port lateral beacon re-established. |
AUS 236 MB8 Beacon to Beacon edition 9, map 121 |
20 January 2012 |
| 040 of 2012 (PDF, 17 KB) |
Story Bridge, Brisbane River – buoy permanently withdrawn. |
AUS 238 Beacon to Beacon edition 9, map 95 |
18 January 2012 |
| 038 T of 2012 (PDF, 18 KB) |
East Knoll Bypass, Moreton Bay – shoaling in the East Knoll Bypass Channel. |
AUS 236, AUS 237 MB1 Beacon to Beacon edition 9, map 90 |
18 January 2012 |
| 034 T of 2012 (PDF, 18 KB) |
Gardens Point, Brisbane River – reinstatement of piles. |
Beacon to Beacon edition 9, map 95 |
16 January 2012 |